LAYING ON GRAVEL

OPEN consente la rapida e veloce installazione a secco, e attraverso la tradizionale posa su massetto, completa le aree che richiedono performance estreme. OPEN è impareggiabile anche nei contesti sopraelevati, per coprire situazioni preesistenti o realizzare pavimentazioni dove alloggiare impianti tecnici.

LAYING ON GRAVEL - VIDEO

Watch the video tutorial and find out how to perform a correct dry laying on gravel.

posa-ghiaia-2

TECHNICAL INFORMATION

1. Create a layer of at least 5 cm of gravel (diam. 3/6 mm) on the existing substrate. Level the surface with a straightedge and check the flatness.

2. Place the slabs dry on the gravel and check that the gap between them is the same over the entire laying surface. Tap down gently with a rubber hammer to settle them into place and eliminate any unevenness.

3. Check the flatness of the surface created. Add gravel in the joints to level the paving. Decorative gravel larger in diameter than the type use for the substrate can also be used in the joints.

posa-ghiaia3

THE ADVANTAGES

  • Inspectable, can house wiring and pipes
  • three types of support
  • Creates smooth surface on uneven ground
  • Good drainage and insulation