Place the slabs dry on the grass and ensure the spacing between them is uniform across the installation area.
2
Mark the area of soil to be removed and dig a minimum of 5 cm deep. Create a gravel layer (3/6 mm diameter) at least 3 cm thick.
3
After verifying the levelness of the prepared base, place the slabs and gently tap with a rubber mallet to stabilize the installation and eliminate any irregularities.